Tuesday, October 6, 2020

network cable installer certification

Horizontal: connection is made using different optical connection boxes. After checking the cables, the installer strips or “splits” the cable to free the optical fibers, leaving a sufficient length which will be spliced ​​and then coiled in casettes in the prepared box.

Vertical: From a connection point of an existing horizontal network, the installer makes a cabling called "adduction cabling" in order to route the optical fiber through the adduction of the building to wire the BPI, which requires the use of a pulling needle as well as all the equipment related to the safety of users on the road. 


network cable installer certification

1 comment: